-
Approval of DuPage County Transportation Committee meeting minutes from September 1st, 2026. (item 6-A) Routine.
-
Approval of contract with Lakeshore Recycling Systems, LLC for solid waste disposal services for October 1, 2026 through September 30, 2027. — $55,000 (item 7-A) Routine.
-
Approval of contract with Federal Signal Corporation Joe Johnson Equipment LLC d/b/a Standard Equipment to furnish and deliver OEM Vactor and Elgin Sweeper parts and service repairs for October 1, 2026 through September 30, 2027. — $60,000 (item 7-B) Routine.
-
Approval of contract with Bowman Consulting Group, Ltd. for various construction engineering services under Section 26-00009-06-EG. — $500,000 (item 7-C) Professional services contract selected through qualification-based process.
-
Approval of contract with Civiltech Engineering, Inc. for Professional Preliminary and Design Engineering Services under Section 26-00009-08-EG for September 22, 2026 through October 31, 2029. — $600,000 (item 7-D) Professional services contract selected through qualification-based process.
-
Approval of contract with Thomas Engineering Group, LLC for Professional Preliminary and Design Engineering Services under Section 26-00009-09-EG for Division of Transportation and Facilities Management for September 22, 2026 through October 31, 2029. — $600,000 (item 7-E) Professional services contract selected through qualification-based process.
-
Authorization to apply for Illinois Transportation Enhancement Program grant of up to $5,000,000 for engineering and construction of the 31st Street Multi-use Trail from Highland Avenue to Meyers Road. — $5,000,000 (item 8-A) County seeks a significant grant to fund a multi-use trail project.
-
Authorization to apply for Illinois Transportation Enhancement Program grant of up to $5,000,000 for engineering and construction of the Stearns Road Multi-use Path from the DuPage/Kane County line to Sayer Road. — $5,000,000 (item 8-B) County seeks a significant grant to fund a multi-use path project.
-
Awarding resolution to Lorig Construction Company for the CH/48 Illinois Prairie Path-Elgin Branch Volunteer Bridge Deck Replacement under Section 22-00316-02-BR with estimated County cost of $242,695. — $242,695 (item 8-C) County awards construction contract for bridge deck replacement project.
The Docket is reader-supported. $5/month keeps it going: https://buy.stripe.com/28E3cx0oQ5Ns1ZVa5xe7m00 . Free either way, always.